How Long Does It Take to Install Laminate Flooring?
Laminate takes about half a day per bedroom and two days for a 500 sq ft main floor. See the full calendar, what adds time, and national install costs.

Laminate takes about half a day per bedroom and two days for a 500 sq ft main floor. See the full calendar, what adds time, and national install costs.

Laminate flooring can't be sanded or refinished, because the wood look is a printed image sealed under a thin wear layer over a fiberboard core, not solid wood. This guide explains why, shows how laminate differs from engineered and solid...